Land
and Construction of Building
After
deciding the location and site three important factors to be kept in
mind before purchasing/ leasing the land are :
-
Availability
of basic amenities like power, water,
-
Connectivity
to nearest rail, road or port and
-
Price
of the land.
Purchase/
lease the land judiciously, because once you have committed, most
probably you will be working there for next 10 year or so.
Once
an industrial plot for the unit is secured, then the next job is
that of finding a suitable architect to design the outlay of area
and factory. Design of factory building has to be in consonance with
the type of industry. Have an appropriate plant layout. If you
are setting business in home, plan the area which is to be used as
your production centre or office judiciouly. You may like to take
help of a professional to ensure that the area is utilised
optimally.
An
architect's estimate of building construction is essential for loan
applications. Further, architect's certificate for money spent on
building is needed for disbursement of loan.
INCENTIVES
The
state government offers incentives like land and building tax
concessions, providing land at cheaper rates through the state
government agencies to new and existing entrepreneurs.
Getting
the Utility Connections
Among
the utilities, of prime importance are power and water. Other
utilities that might be required are steam, compressed air, fuel.
Assess your requirement of such utilities, make arrangement to get
these and ascertain the cost of consuming these.
WATER
SUPPLY : Check out what is source of your water supply is
it river, canal, tubewell or something else, how far is it from your
land, quality of water (PH, hardness), does it meet you specific
requirements, rate/ water charges applicable, common storage
facility, who is the operating authority (Public Works Department,
Estate-Corporation, Municipality).
POWER
SUPPLY : Nearest substation from where you will get power, power
tariff rate, feeder type (industrial/rural) availability, quality of
power, duration etc. In many cases getting power connection causes
delay in setting up of plant. Therefore it is imperative to commence
work on these aspects with diligent follow up. Power connections are
generally of either LT (Low Tension) or HT (High tension) type. If
connected load is upto 75 HP, LT connection is provided. For
connected loads of 130 HP or higher only HT connection is provided.
A
formal application needs to be made in a specific form to the state
electricity board. An electrical inspector is deputed for evaluation
of application to factory site, after which the load is sanctioned.
In areas of power shortage, it is advisable to augmen the power
supply with a captive generating set.
Water
connection is also obtained likewise by applying in advance in
formal forms. The water supply can be augmented by installation of
tubewell.
INCENTIVES:
The
State Government offers a number of concessions and incentives to
industry like Concessions in water tariff, Power subsidy, Subsidy on
Generating sets, Transport Subsidy, Incentive for Pollution control
and quality equipment depending on the location, size of investment
and category of the industry.